Project manager performance improvement for design and build construction state building
-
Published: July 1, 2025
-
Page: 8-17
Abstract
The Design and Build (D&B) method has become a dominant approach in Indonesian government construction projects due to its potential to accelerate project timelines by integrating design and implementation. However, significant delays persist—especially in Jakarta indicating that technical improvements alone are insufficient. This study investigates how managerial behavior and work culture influence the timeliness of government D&B construction projects. Using a quantitative approach, surveys were conducted among project managers, construction consultants, and procurement officials involved in D&B projects in Jakarta between 2015 and 2018. Key variables examined include leadership style, decision-making agility, work ethic, communication effectiveness, problem-solving ability, and technical competence. Regression analysis revealed that leadership and work ethic positively affect timely completion. Surprisingly, communication effectiveness and agile decision-making were associated with delays, likely due to bureaucratic complexity and unstable project environments. Technical and problem-solving skills proved insufficient without strong behavioral support. The findings underscore the importance of behavioral competencies particularly leadership and discipline in project performance. The study also noted inconsistencies in instrument reliability, suggesting refinement for future use. Recommendations include revising recruitment standards to emphasize behavioral attributes and enhancing methodological rigor in similar research. A shift in focus from purely technical to integrated behavioral competencies is essential for improving public sector project outcomes.
References
- Ackon, F., Kheni, N. A., Mensah, J. V., & Barajei, C. (2024). Effects of Organizational Culture Types on Construction Project Performance: A Competing Values Framework Approach in Ghanaian Perspective. African Journal of Empirical Research, 5(4), 1850–1858.
- Agustina, R., Aminuddin, A., & Agus, N. F. (2024). Assessing the work ethic among employees of the Bengkulu City Regional Secretariat.
- Al Fath, A. A., Herwindiati, D. E., Wibowo, M. A., & Sari, E. M. (2024). Integrated design and procurement strategy to achieve efficient performance in design and build government project. Journal of Infrastructure, Policy and Development, 8(11), 1–18. https://doi.org/10.24294/jipd.v8i11.7510
- Ali Almuhannadi, M., & Salem Ghareeb, A. (2024). Enhancing design–bid–build project delivery: A comprehensive review and framework for contractor selection and project optimisation in the construction industry. Organization, Technology & Management in Construction: An International Journal, 16(1), 63–80.
- Bolaji, A. S., Fasasi, T. O., Adeshina, N., Busari, I. O., & Peter, K. (n.d.). Behavioural Safety Practices in Accident Prevention and Reduction in Large-Scale Construction Projects.
- Fafure, J., Akanni, P., & Obasa, A. (2025). Optimizing Leadership Styles for Enhanced Skills Transfer Among Construction Managers in Lagos State, Nigeria. International Journal of Research and Innovation in Applied Science, IX, 296–311. https://doi.org/10.51584/IJRIAS.2024.912028
- Kearney, J., Bond-Barnard, T., & Chugh, R. (2024). Soft skills and learning methods for 21st-century project management: a review. International Journal of Information Systems and Project Management, 12(4), 2.
- Khomariyah, N., Saddewisasi, W., & Sugiarti, R. (2024). Pengaruh gaya kepemimpinan dan budaya organisasi terhadap disiplin kerja dengan mediasi motivasi kerja pada pegawai disporabudpar grobogan. Journal of Management: Small and Medium Enterprises (SMEs), 17(3), 1245–1256.
- Kissi, E., Eluerkeh, K., Aigbavboa, C., Addy, M., & Babon-Ayeng, P. (2025). Project managers’ competencies in the era of digitalization: the case of the construction industry. Built Environment Project and Asset Management, 15(1), 165–189.
- Kour, M., & Kharat, A. U. (2025). An Empirical Study on the Impact of Agile Leadership on Project Managers’ Performance With Special Reference to Industry 4.0-Related Projects. In Leadership Paradigms and the Impact of Technology (pp. 87–106). IGI Global Scientific Publishing.
- Kusumawati, J., Mochtar, K., & Najid. (2020). Performance Improvement Factors of the Experts of the Design and Build Project of the State Buildings. International Journal of Advanced Science and Technology, 29(05), 1287–1294.
- Kusumawati, J., & Setiawan, Y. (2024). Analysis of Delays and Time Acceleration Strategies in the Renovation of Grha JST Building. West Science Interdisciplinary Studies, 2(06), 1303–1314. https://doi.org/10.58812/wsis.v2i06.1031
- Lahdenpera, P. (2024). Design-build with a development phase: An initiation and the first trials. Construction Economics and Building, 24(4/5), 18–42.
- Lee, S., Kim, S.-C., Choi, S., & Park, S. (2024). The Impact of Project Manager’s Competency onCorporate Performance: Focusing on The Mediating Effect of Management Efficiency. The Academic Society of Global Business Administration, 21, 40–71. https://doi.org/10.38115/asgba.2024.21.6.40
- Lemein, J. P., & Nyaberi, D. N. (n.d.). Project Time Management and Performance of Kenya Towns Water Supply and Sanitation Programme at Central Rift Water Works Development Agency. International Journal of Social Science and Humanities Research (IJSSHR) ISSN 2959-7056 (o); 2959-7048 (P), 2(3).
- Mercado, L., & Facelli, P. (2024). Systematic review of the most relevant competencies for projects managers in the construction industry. Obras y Proyectos, 36, 95–110.
- Namira, A.-Z., & Latief, Y. (2024). Evaluation of the implementation of integrated design and build construction contracts based on LKPP Regulation No. 12 of 2021 based on contract management body of knowledge and risk minimizing dispute claims from the service provider’s perspective. International Research Journal of Engineering, IT and Scientific Research, 11, 14–22. https://doi.org/10.21744/irjeis.v11n1.2494
- Naqvi, I., Aziz, S., & Rehman, D. (2011). The Impact of Stakeholder Communication on Project Outcome. African Journal of Business Management, 5(14), 5824–5832.
- Njuguna, M., Alkizim, A., & Wanyona, G. (2024). Organizational culture’s influence on the adoption of information management technology in construction projects in Nairobi, Kenya. Journal of Agriculture, Science and Technology, 23(5), 22–33.
- Nugraha, R., & Mursadin, A. (2024). Design And Build Project Risk Analysis at Tugu Pal 0 Stage II Project Construction. International Journal of Research and Review, 11, 301–309. https://doi.org/10.52403/ijrr.20241028
- Peli, M., Ariani, V., Khadavi, K., & Roza, F. (2024). Kerangka Pengembangan dan Kepemimpinan Budaya Mutu dalam Konstruksi di Indonesia: Tinjauan Studi Literatur. Jurnal Talenta Sipil, 7(2), 725–736.
- Putro, A., & Latief, Y. (2020). Implementation of design and build contract in government building construction project practice. IOP Conference Series: Materials Science and Engineering, 897(1), 12016.
- Rehan, A., Thorpe, D., & Heravi, A. (2024). An empirical study on project managers’ leadership behavioral practices impacting project success–the Australian construction sector. International Journal of Construction Education and Research, 1–25.
- Rosanti, M., Hasbullah, H., & Silvia, D. (2023). Pengaruh Etos Kerja dan Lingkungan Kerja Terhadap Produktivitas Kerja Karyawan Perum Damri Cabang Lampung. JUMINTAL: Jurnal Manajemen Informatika Dan Bisnis Digital, 2(2), 199–206.
- Sanka, E. (2024). Impact of Stakeholder Engagement on the Success of Water, Sanitation, and Hygiene Projects in Babati, Tanzania. Journal of Policy and Development Studies, 17(1), 46–53.
- Saputra, W. (2024). Pengaruh Gaya Kepemimpinan dan Budaya Organisasi Terhadap Keterlibatan Karyawan. Indo-Fintech Intellectuals: Journal of Economics and Business, 4(4), 1559–1567.
- Serogina, D., Pushkar, T., & Zhovtiak, H. (2021). The Impact of the Construction Industry on the Social and Economic Development of Territories. Scientific Bulletin of the National Academy of Statistics, Accounting and Audit, 1–2, 59–65.
- Studies, D., & Clemence, B. (2024). Communication Management Factors and Performance of Rwamagana Leaders ’ School Project in. 143–153. https://doi.org/10.53983/ijmds.v13n9.010
- Tiwari, A. R. (2021). Investigating Integration of Sustainability Ideas in Design of Construction Projects. 7(4), 2021.
- Umuteme, O. M., & Adegbite, W. M. (2024). Operational Variables Influencing Team Effectiveness, Culture, and Leadership in the Nigerian Oil and Gas Project Environment. Modern Management Review, 29(3), 79–102.
- Uwamahoro, C., & de Dieu Dushimimana, J. (2024). Project Manager’s Soft Skills and Project Performance: A Case of Transforming Eastern Province Through Adaptation Project in Bugesera District, Rwanda. African Journal of Empirical Research, 5(4), 1970–1986.
- Uwitonze, S., & Irechukwu, E. N. (2024). Factors Influencing Completion of Non-Governmental Projects in Rwanda. A Case of the Society for Family Health Rwanda’s Youth Employment Project. International Journal of Entrepreneurship and Project Management, 9(5), 1–21.